Boston Whaler Project
Completed by WEL / WAREHOUSE EQUIPMENT & LIQUIDATIONS, LLC
Installed by WEL: 640 pallet positions of pallet flow with conveyor segments and 108 pallet positions with wire deck.
Installation was done outside on a concrete drainage slab, making WEL have to shim the middle uprights almost 1″ high to make the system level